Northwood

Off Grid Case Study

OVERVIEW

Christian already ran a successful luxury camping business in a forest near York, England. His next plan was to create a fairy trail around the nearby forest. There, children could explore in an exciting and safe environment with a fairy museum and grotto in a cabin, complete with a restaurant that serves high quality locally-produced food and drinks. He already had limited electricity on the camp site, but the power company could not connect any additional loads. He was quoted a large fee from the local grid for a new connection, and as the land was on a lease, Christian was not willing to add value to the land at his cost. In addition to that, he was also keen on making the business sustainable, similar to the camp site.

  • Location
  • System Power
  • Components